The Art of Connection
“Clients report higher satisfaction levels with Design/ Build
projects due to increased collaboration, faster delivery and
fewer unexpected surprises.”
– American Institute of Architects –
1 Step is Fewer Than 3 (AND CHEAPER)
A study conducted by the Design-Build Institute of America (DBIA) provides insightful evidence of how effective design and planning can result in significant cost savings in construction projects. The DBIA compared the project costs of a Design/ Build team (1 call) to the costs of a traditional design-bid-build model (3 calls).
The findings revealed that projects employing the Designer/ Builder approach experienced cost savings ranging from 6% to 10% compared to the traditional model. This significant difference in costs was attributed to the collaborative nature of the Design-Build process, where professionals work together from the project’s inception, leading to streamlined communication, no change orders (Save for scope of work changes), and enhanced efficiency.
This is why we do what we do at WD-4D Builders. As a Design/ Build team, we take thoughtful design and meticulous planning and translate them into tangible improvements in the construction process. By embracing this integrated approach, we achieve substantial cost savings and deliver the highest quality results, bringing our clients confidence that they are making all of the right decisions throughout their project(s).